ComeSys Europe Ltd design and
manufacture electronic control systems for a variety of vehicles and industrial
applications. They had been experiencing a significant increase in order volume
and wanted to ensure that their systems for planning and scheduling the work
through their business were as effective as possible. The last thing that ComeSys
wanted was to increase the volume of sales running through their business and
not to be able to deliver on time.
In essence they wanted to deliver
on time without the guesswork needed - they wanted to remain in control of
their business.

Results
Since doing this work Comesys Europe
Ltd have experienced a number of performance improvements that this work has
contributed towards. The most notable improvement was the gain of 50 percentage
points in terms of on-time delivery performance.
So, with our help, Comesys Europe
Ltd have instilled some new disciplines and revised their approach to scheduling
within their business. This has put them back in control of their business as
it experiences growth in sales volume, the other functions of the business now link
up thanks to the daily production meeting and they're no longer getting caught
out by being too busy to do the right things at the right time.